The  manufacturing, ،loading, transferring, installing and testing stages of the SAM HIGHTECH ,

The manufacturing, ،loading, transferring, installing and testing stages of the SAM HIGHTECH ,

The manufacturing, ،loading, transferring, installing and testing stages of the SAM HIGHTECH , 0 212

The  manufacturing, ،loading, transferring, installing and testing stages of the SAM HIGHTECH offline resin curing furnace of Faraz Kashan factory, Mr. Marandi, 
- Suitable for all types of slabs, especially broken and multi-piece slabs
- The curing time is about 3 to 6 minutes (depended totheresin type).
- Can be used for different sizes (tile to big slabs)
- automated and user friendly 
- equipted to Siemens logic unit

Comment

captcha
Scroll to top